Excess Water Slows Lake Mead Connector Tunnel

A local news report said completion of a half-mile connector tunnel will come in January and cost $5 million more than the previous estimate because more water is seeping into the work site than expected.

The Southern Nevada Water Authority's drinking water Intake No. 3 project has been slowed a bit, according to a report published by the Las Vegas Review-Journal. The newspaper reported the authority's board voted May 17 to approve a $5 million change order that means a half-mile connector tunnel won't be finished until January 2013.

The reason is that more water is seeping into the work site around 400 feet underground than expected, according to the report, which said the $800 million project already has fallen about 20 months behind schedule.

The project initially won approval in May 2005 in response to unprecedented drought conditions. It is intended to protect southern Nevada's primary water source, Lake Mead, and when completed will allow the authority to draw upon Colorado River water at lake elevations as low as 1,000 feet above sea level (ensuring system capacity if lake levels fell low enough to put Intake No. 1 out of service). Intake No. 3 will connect existing Intake No. 2 to carry water to the authority's water treatment facilities.

In March 2012, the concrete pour for the structure of Intake No. 3 was completed 2.5 miles off the shore of Lake Mead over a period of 12 days. The work required 12,000 cubic yards of concrete pumped from 1,086 trucks that were carried to the site on 143 barges.

Download Center

HTML - No Current Item Deck
  • Free Safety Management Software Demo

    IndustrySafe Safety Management Software helps organizations to improve safety by providing a comprehensive toolset of software modules to help businesses identify trouble spots; reduce claims, lost days, OSHA fines; and more.

  • Comply with OSHA’s Electronic Recordkeeping Requirements

    Collect relevant incident data and generate accurate OSHA 300, 300A, and 301 regulatory reports, including 300A CSV files for easy electronic submission to OSHA.

  • Complete Online Safety Training Courses

    Deliver state-of-the art, online safety training courses to your organization with IndustrySafe Training Management Software. Generate reports to track training compliance and automatically notify learners of upcoming or overdue classes.

  • Easy to Use Safety Inspection App

    Conduct inspections on the go with IndustrySafe’s mobile app. Complete safety audits at job sites and remote locations—with or without web access.

  • Track Key Safety Performance Indicators

    IndustrySafe’s Dashboard Module allows organizations to easily track safety KPIs and metrics. Gain increased visibility into your business’ operations and safety data.

  • Industry Safe
comments powered by Disqus
Live From Safety