Excess Water Slows Lake Mead Connector Tunnel

A local news report said completion of a half-mile connector tunnel will come in January and cost $5 million more than the previous estimate because more water is seeping into the work site than expected.

The Southern Nevada Water Authority's drinking water Intake No. 3 project has been slowed a bit, according to a report published by the Las Vegas Review-Journal. The newspaper reported the authority's board voted May 17 to approve a $5 million change order that means a half-mile connector tunnel won't be finished until January 2013.

The reason is that more water is seeping into the work site around 400 feet underground than expected, according to the report, which said the $800 million project already has fallen about 20 months behind schedule.

The project initially won approval in May 2005 in response to unprecedented drought conditions. It is intended to protect southern Nevada's primary water source, Lake Mead, and when completed will allow the authority to draw upon Colorado River water at lake elevations as low as 1,000 feet above sea level (ensuring system capacity if lake levels fell low enough to put Intake No. 1 out of service). Intake No. 3 will connect existing Intake No. 2 to carry water to the authority's water treatment facilities.

In March 2012, the concrete pour for the structure of Intake No. 3 was completed 2.5 miles off the shore of Lake Mead over a period of 12 days. The work required 12,000 cubic yards of concrete pumped from 1,086 trucks that were carried to the site on 143 barges.

Download Center

HTML - No Current Item Deck
  • Safety Management Software - Free Demo

    IndustrySafe Safety Software’s comprehensive suite of modules help organizations to record and manage incidents, inspections, hazards, behavior based safety observations, and much more. Improve safety with an easy to use tool for tracking, notifying and reporting on key safety data.

  • Create Flexible Safety Dashboards

    IndustrySafe’s Dashboard Module allows organizations allows you to easily create and view safety KPIs to help you make informed business decisions. Our best of breed default indicators can also save you valuable time and effort in monitoring safety metrics.

  • Schedule and Record Observations

    IndustrySafe's Observations module allows managers, supervisors, and employees to conduct observations on employees involved in safety critical behavior. IndustrySafe’s pre-built BBS checklists may be used as is, or can be customized to better suit the needs of your organization.

  • Why Is Near Miss Reporting Important?

    A near miss is an accident that's waiting to happen. Learn how to investigate these close calls and prevent more serious incidents from occurring in the future.

  • Get the Ultimate Guide to Safety Training

    When it comes to safety training, no matter the industry, there are always questions regarding requirements and certifications. We’ve put together a guide on key safety training topics, requirements for certifications, and answers to common FAQs.

  • Industry Safe
comments powered by Disqus

OH&S Digital Edition

  • OHS Magazine Digital Edition - April 2019

    April 2019

    Featuring:

    • ELECTRICAL SAFETY
      Taking the Guesswork Out of De-Energizing Industrial Equipment 
    • VISION PROTECTION
      Four Simple and Effective Ways to Avoid Digital Eye Strain
    • FOOT PROTECTION
      PPE the Automotive Industry Needs to Invest In
    • FIRE SAFETY
      Eliminate 10 Fire Hazards That May Be in Plain Sight
    View This Issue