$75 Million Awarded for Utah Transit Authority's Bus Rapid Transit

The line will connect two communities south of Salt Lake City

The DOT’s Federal Transit Administration (FTA) has announced the award of $75 million to the Utah Transit Authority (UTA) in order to build a 10.5-mile bus rapid transit (BRT).  According to the news release, the line will connect two communities south of Salt Lake City and provide service between two of the state’s biggest universities.

The federal grant will fund close to half the cost of the line.

“When completed, the Provo-Orem BRT line will add another important link in Salt Lake City’s increasingly comprehensive regional transit system,” said U.S. Transportation Secretary Anthony Foxx. “The Obama Administration is pleased to support a project that will provide quick and efficient transit access to jobs, schools and other opportunities in Utah’s growing Wasatch Front region.”

More specifically, the line will start at the Orem Transit Center and run to downtown Provo, making stops at Utah Valley University, Brigham young University and Provo Central Station.

“The Provo-Orem BRT line will help create new connections for residents, commuters, and students and faculty traveling to and from the universities and Provo’s bustling downtown,” said FTA Acting Administrator Carolyn Flowers. “This new transportation option will serve an area that is seeing significant job growth, and help the two cities limit traffic congestion and reduce their environmental footprint even as their populations increase.”

Product Showcase

  • Magid® D-ROC® GPD412 21G Ultra-Thin Polyurethane Palm Coated Work Gloves

    Magid’s 21G line is more than just a 21-gauge glove, it’s a revolutionary knitting technology paired with an advanced selection of innovative fibers to create the ultimate in lightweight cut protection. The latest offering in our 21G line provides ANSI A4 cut resistance with unparalleled dexterity and extreme comfort that no other 21-gauge glove on the market can offer! Read More

  • Safety Shower Test Cart

    The Safety Shower Test Cart speeds up and simplifies emergency shower tests, ensures you stay in compliance with OSHA regulations, and significantly reduces testing costs. With 7 unique features, the cart makes testing easy, effective, and efficient. You can test water clarity, flow, temperature, and spread—all at the same time! Most safety shower testing kits create a mess, take too much time to use, and don't fully help you stay in compliance with OSHA & ANSI standards. Transform the way you test emergency showers with Green Gobbler Safety. Read More

  • Kestrel 5400 Heat Stress Tracker WBGT Monitoring for Workplace Safety

    Ensure safety with the Kestrel® 5400 Heat Stress Tracker, the go-to choice for safety professionals and endorsed by the Heat Safety & Performance Coalition. This robust, waterless WBGT meter is ideal for both indoor and outdoor environments, offering advanced monitoring and data logging essential for OSHA compliance. It features pre-programmed ACGIH guidelines and alert settings to quickly signal critical conditions. Integrated with the cloud-based Ambient Weather Network, the 5400 allows managers to view, track, and log job site conditions remotely, ensuring constant awareness of potential hazards. Its capability for real-time mobile alerts and remote data access promotes proactive safety management and workplace protection, solidifying its role as a crucial tool in industrial hygiene. Read More

Featured

Artificial Intelligence