The Nuclear Regulatory Commission is conducting a special inspection at the DC Cook Nuclear Power Station to review circumstances around a turbine generator fire and degradation of the fire suppression system. The two-unit plant is operated by American Electric Power and is located in Stevensville, Mich.

On Sept. 20, a malfunction in the Unit 1 turbine generator resulted in a fire and caused the operators to manually shut down the reactor. The turbine generator transforms steam into electricity. All nuclear safety systems functioned as expected and were not affected by the fire which occurred in a building separate from the nuclear reactor, according to NRC. The utility declared an unusual event, the lowest of NRC's four emergency classifications, when the fire could not be extinguished within 15 minutes. The fire was extinguished 25 minutes after it started. There were no injuries and no hazard to the public.

After the fire was extinguished, operators received a signal indicating a problem with the fire suppression system. The cause of the problem was a rupture in the pipe which is a source of water for the plant’s fire protection systems. Alternate sources of water were available for fire suppression in case they were needed.

The four-person special inspection team will review the causes for the turbine generator malfunction, the fire, and the problems with the fire suppression system. The special inspection team will also review the utility's corrective actions.

"Plant operators took quick action to safely shut down the reactor and activate the fire suppression system," said Regional Administrator James Caldwell. "However, we seek to gain a more thorough understanding of what caused the turbine problems and the fire, as well as the causes of the degradation of the plant’s fire suppression system."

The duration of a special inspection cannot be determined in advance. The average duration of a special inspection is seven days. The inspection report will be issued about 45 days after the inspection is complete. It will be available through the NRC RIII Office of Public Affairs and at http://www.nrc.gov/reading-rm/adams/web-based.html.

Download Center

HTML - No Current Item Deck
  • Get the Ultimate Guide to OSHA Recordkeeping

    OSHA’s Form 300A posting deadline is February 1! Are you prepared? To help answer your key recordkeeping questions, IndustrySafe put together this guide with critical compliance information.

  • Steps to Conduct a JSA

    We've put together a comprehensive step-by-step guide to help you perform a job safety analysis (JSA), which includes a pre-built, JSA checklist and template, steps of a JSA, list of potential job hazards, and an overview of hazard control hierarchy.

  • Everything You Need to Know about Incident investigations

    Need some tips for conducting an incident investigation at work after there’s been an occupational injury or illness, or maybe even a near miss? This guide presents a comprehensive overview of methods of performing incident investigations to lead you through your next steps.

  • Free Safety Management Software Demo

    IndustrySafe Safety Management Software helps organizations to improve safety by providing a comprehensive toolset of software modules to help businesses identify trouble spots; reduce claims, lost days, OSHA fines; and more.

  • Industry Safe
Bulwark CP

OH&S Digital Edition

  • OHS Magazine Digital Edition - October 2020

    October 2020

    Featuring:

    • FACILITY SECURITY
      EHS Compliance: Make it Personal
    • FOOT PROTECTION
      Choosing the Right Safety Shoe for Your Industry
    • HAND PROTECTION
      A Requirements Checklists for Work Safety Gloves
    • COVID-19 MANAGEMENT
      Contemporary Issues in HSE Management
    View This Issue